

Case CE Factory Fit Leica Machine Control
Case Construction is now offering Leica 3D and 2D machine control right from the factory.


Caterpillar Operator Stadium - Conexpo 2020
Quantum Land Design played a hidden, but big part in Caterpillar's Operator Stadium demos at Conexpo/Con-Agg 2020.


Ground Control - Principle 4
Another important consideration when laying out your ground control is topo check shots.


Ground Control - Principle 5
ALWAYS, and only, measure in your ground control with a rover that is fully calibrated to the site control for your GPS system.


Komatsu PC490LCi Underwater Wall Grinding
This Komatsu Construction 490LCi is grinding a wall, underwater, in a barge lock.


Ground Control - Principle 3
To start, place a GCP on roughly the highest and lowest spots on your project. Don't worry about...


Ground Control - Principle 2
Surrounding the site with ground control is a simple, but often overlooked, step. Usually four to six GCP's...


Ground Control - Principle 1
When placing ground control, it is critical to look for overhead obstructions. If the drone can't see your GCP as it flies overhead, that GC